Driving Directions from Chikka Hagade Cross to
Dommasandra Circle
Strat from Chikka Hagade Cross
Then go 2.83 K.M. to
Marasur Cross (Hosur Road)
Then go 2.87 K.M. to
Iggalur
Then go 0.5 K.M. to
Suryanagar Depot
Then go 1.33 K.M. to
Chandapura Circle
Then go 0.44 K.M. to
Chandapura Railway Overbridge
Then go 1.56 K.M. to
Thirumagondanahalli
Then go 0.86 K.M. to
Neraluru
Then go 1.02 K.M. to
Guddahatti Gate
Then go 0.7 K.M. to
Guest Line Hotel (Attibele)
Then go 0.83 K.M. to
Yadavanahalli
Then go 1.5 K.M. to
Attibele Checkpost
Then go 0.87 K.M. to
Attibele
Then go 1.07 K.M. to
Indlabele
Then go 2.29 K.M. to
Bidaraguppe
Then go 1.12 K.M. to
Bhel Navaratna Layout Cross
Then go 1.55 K.M. to
Thyvakanahalli
Then go 0.71 K.M. to
Billapura
Then go 2.81 K.M. to
Sarjapur
Then go 1.45 K.M. to
Sompura Gate
Then go 1.32 K.M. to
Yamare
Then go 0.72 K.M. to
Chambenahalli
Then go 0.72 K.M. to
Dommasandra
Then go 0.51 K.M. to
Dommasandra Circle
Note:These Directions are extracted from BMTC Route 399F .
One ways are not considered while preparing route
|
CLICK HERE TO VIEW IT ON MAP
|
|